https://www.avient.com/sites/default/files/2024-12/Terms and Conditions of Sale for India %28English%29.pdf
Seller shall not be subject to any liability or damages
for delay in performance or non-performance as a result of fire,
flood, ice, natural catastrophe, pandemic, strike, lockout, labor
shortage, labor dispute or trouble, accident, riot, act of governmental
authority, act of God, war, act of terrorism (including cyber-
terrorism and ransomware attacks), or other contingencies and/or
circumstances beyond its reasonable control interfering with the
production, supply, storage, transportation, or consumption of the
Products or with the supply of any raw materials used in connection
therewith, or the inability of Seller to purchase raw materials at a
commercially reasonable price, or if performance would be contrary
to, or constitute a violation of, any regulation, law, or requirement
of a recognized government authority, and quantities so affected
may be eliminated by Seller from this contract without liability or
damages to Seller, but this contract shall otherwise remain
unaffected.
https://www.avient.com/sites/default/files/2024-12/Terms and Conditions of Sale for Singapore %28English%29.pdf
Seller shall not be subject to any liability or
damages for delay in performance or non-performance as a result
of fire, flood, ice, natural catastrophe, pandemic, strike, lockout,
labor shortage, labor dispute or trouble, accident, riot, act of
governmental authority, act of God, act of terrorism (including
cyber-terrorism and ransomware attacks), or other contingencies
and/or circumstances beyond its reasonable control interfering
with the production, supply, transportation, or consumption of
the Products or with the supply of any raw materials used in
connection therewith, or the inability of Seller to purchase raw
materials at a commercially reasonable price, or if performance
would be contrary to, or constitute a violation of, any regulation,
law, or requirement of a recognized government authority, and
quantities so affected may be eliminated by Seller from this
contract without liability or damages to Seller, but this contract
shall otherwise remain unaffected.
https://www.avient.com/sites/default/files/2024-12/Terms and Conditions of Sale for Thailand %28English%29.pdf
Seller shall not be subject to any liability or damages
for delay in performance or non-performance as a result of fire,
flood, ice, natural catastrophe, pandemic, strike, lockout, labor
shortage, labor dispute or trouble, accident, riot, act of governmental
authority, act of God, war, act of terrorism (including cyber-
terrorism and ransomware attacks), or other contingencies and/or
circumstances beyond its reasonable control interfering with the
production, supply, transportation, or consumption of the Products
or with the supply of any raw materials used in connection therewith,
or the inability of Seller to purchase raw materials at a commercially
reasonable price, or if performance would be contrary to, or
constitute a violation of, any regulation, law, or requirement of a
recognized government authority, and quantities so affected may be
eliminated by Seller from these Terms without liability or damages
to Seller, but these Terms shall otherwise remain unaffected.
https://www.avient.com/sites/default/files/2024-12/Terms and Conditions of Sale for Hong Kong %28English%29.pdf
Seller shall not be subject to any liability or damages
for delay in performance or non-performance as a result of fire,
flood, ice, natural catastrophe, pandemic, strike, lockout, labor
shortage, labor dispute or trouble, accident, riot, act of governmental
authority, act of God, war, act of terrorism (including cyber-
terrorism and ransomware attacks), or other contingencies and/or
circumstances beyond its reasonable control interfering with the
production, supply, transportation, or consumption of the Products
or with the supply of any raw materials used in connection therewith,
or the inability of Seller to purchase raw materials at a commercially
reasonable price, or if performance would be contrary to, or
constitute a violation of, any regulation, law, or requirement of a
recognized government authority, and quantities so affected may be
eliminated by Seller from this contract without liability or damages
to Seller, but all other terms shall otherwise remain unaffected.
https://www.avient.com/sites/default/files/2024-12/Terms and Conditions of Sale for Czech Republic.pdf
Seller shall not be subject to any liability or damages
for delay in performance or non-performance as a result of fire,
flood, ice, natural catastrophe, pandemic, strike, lockout, labor
shortage, labor dispute or trouble, accident, riot, act of governmental
authority, act of God, war, act of terrorism (including cyber-
terrorism and ransomware attacks), or other contingencies and/or
circumstances beyond its reasonable control interfering with the
production, supply, transportation, or consumption of the Products
or with the supply of any raw materials used in connection therewith,
or the inability of Seller to purchase raw materials at a commercially
reasonable price, or if performance would be contrary to, or
constitute a violation of, any regulation, law, or requirement of a
recognized government authority, and quantities so affected may be
eliminated by Seller from the purchase contract without liability or
damages to Seller, but the purchase contract shall otherwise remain
unaffected.
https://www.avient.com/sites/default/files/2025-05/AVNT May Investor Presentation_w_non-GAAP_0.pdf
Senior management believes these
measures are useful to investors because they
allow for comparison to Avient's performance in
prior periods without the effect of items that, by their
nature, tend to obscure Avient's operating results
due to the potential variability across periods based
on timing, frequency and magnitude.
https://www.avient.com/industries/consumer/consumer-discretionary/home-household/housewares-accessories
Edgetek™ BIO Natural Filled Formulations
ColorMatrix™ FlexCart™ G
Learn how to build a FlexCart™ G
https://www.avient.com/sites/default/files/2023-03/Avient Annual Report 2022.pdf
Polymers are a class of organic materials that are generally produced by converting natural gas or crude oil
derivatives into monomers, such as ethylene, propylene, and styrene.
We also provide custom-formulated liquid systems that meet a variety of customer needs and
chemistries, including polyester, vinyl, natural rubber and latex, polyurethane and silicone.
Senior Vice President, Chief Technology Officer
JOEL RATHBUN
Senior Vice President, Mergers and Acquisitions
KYLE G.
https://www.avient.com/sites/default/files/2024-10/Avient CDP Climate Change %26 Water Submission 20241001.pdf
These include energy efficiency, renewable raw materials, light weighting and conserving
natural resources.
Our scope 1 emissions accounts for diesel, natural
gas, and self-generated solar and wind power.
For the calculation, we have estimated 10,000 Kwh savings linked to reduction in gas natural consumption. 2.
https://www.avient.com/sites/default/files/2020-08/2020-hammerhead-application-install-guide.pdf
MARINE PLYWOOD
Hammerhead™ panels are three times lighter than marine plywood
MOISTURE ABSORPTION % weight change due to water absorption for selected
composites and marine plywood
10000
60000
110000
160000
210000
260000
310000
360000
0.5 0.75 1 1.25 1.5
F
le
x
u
ra
l
R
it
y
-
lb
/
2
Panel Thickness - in
Hammerhead™ 5.3lb/in^3 Core Density Hammerhead™ 8.4lb/in^3 Core Density Plywood
— Hammerhead™ 5.3 lb/ft3 Core Density
— Hammerhead™ 8.4 lb/ft3 Core Density
— Marine Plywood
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
0 10 20 30 40 50 60 70 80 90 100
%
W
t
C
a
g
Immersion Time - Days
.50" Hammerhead™ .75" Hammerhead™ 1" Hammerhead™ 1.50" Hammerhead™
.50" marine plywood .75" marine plywood 1" marine plywood
Fl
ex
ur
al
R
ity
-
lb
-in
2
INSTALLATION INSTRUCTIONS
CUTTING & DRILLING
Recommended blade: Industrial fine cut-off saw blade, 10" x 80 teeth 38° ATB grind with 5/8" bore,
PTFE coating
Recommended router bits: 3/8" diameter, 4 flute TiAlN (titanium aluminum nitride) coated carbide bit
FORMING
Apply localized 400˚F heat at a length proportional to the panel thickness (see equation below)
and bend to shape.