https://www.avient.com/sites/default/files/2023-01/Revolve Tripod Case Study.pdf
From deployable composite booms in space to lightweight antenna mast structures on the ground, its unique technology has attracted attention from engineers and product designers worldwide.
https://www.avient.com/sites/default/files/2021-12/composite-vibratory-springs-case-study.pdf
Drawing on over 65 years of composite expertise in manufacturing high performance archery bow limbs - which require consistent, deep deflection under high loads each time the bowstring is pulled - the Gordon Composites team has translated this technology into continuous fiber reinforced composite springs that are specifically engineered to meet the rigorous demands of vibratory conveyors.
https://www.avient.com/sites/default/files/2020-08/composite-braces-case-study.pdf
The composite material used to make this part includes a custom-formulated thermoset epoxy resin, which also has good corrosion and chemical resistance.
https://www.avient.com/sites/default/files/2024-12/ISO9001 2015 Certificate for Shenzhen Plant%282024-2027%29.pdf
No. 1, Qihang Industry Park, Haoxiang Road, Shajing Town, Baoan, Shenzhen, Guangdong, China 518104 has been found to conform to the Quality Management System standard: GB/T 19001-2016 / ISO 9001:2015 This certificate is valid for the following scope: Development and Manufacture of Masterbatch, Pigment Concentration, Plastisol; Manufacture of Plastic Compounding Material http://www.dnv.com/assurance 证书制作地点及日期: 证书认可签发机构: 上海, 2024年10月 10日 DNV - Business Assurance 中国上海市长宁区虹桥路1591号9号楼A座 邮编: 200336 电话: +86 21 32799000 朱海明 管理代表 未履行认证协议中规定条款会导致此证书失效,获证组织必须定期接受监督审核并经审核合格此证书方继续有效。
https://www.avient.com/sites/default/files/2025-03/ISO 13485 2025.pdf
View PDF The SQS herewith attests that the organisation named below has a management system that meets the requirements of the normative basis mentioned. 40 20 _2 / Ja nu ar 20 24 _V er si on 3 .1 Certificate Avient Switzerland GmbH Hauptstrasse 30 4127 Birsfelden Switzerland Certified sites according to appendix Scope Design and manufacture of colour and additive concentrates and specialty compounds for the Healthcare and Medical device market.
https://www.avient.com/sites/default/files/2025-07/Toluca IATF 2025.pdf
Toluca 2000 Toluca Estado de México 50233 Mexico USI#6RS5T3 (WITH ADDITIONAL FACILITIES LISTED ON ATTACHED ANNEX) has been assessed by ABS Quality Evaluations, Inc. and found to be in conformance with the requirements set forth by: IATF 16949:2016 , First Edition The Quality Management System is applicable to: DESIGN AND MANUFACTURE OF COLOR CONCENTRATES Certificate No: 63431 IATF No: 0566308 Effective Date: 17 FEB 2025 Expiration Date: 16 FEB 2028 Revision Date: 17 FEB 2025 Dominic Townsend, President Copyright as of the Effective Date, ABS Quality Evaluations, Inc.
https://www.avient.com/sites/default/files/2021-08/2030-goals-2020-sustainability-report.pdf
• Our next level commitment for 2030 has been established, whereby we will achieve a reduction of 60% and operational carbon neutrality by 2050.
https://www.avient.com/sites/default/files/2021-04/avnt-fourth-quarter-2020-news-release.pdf
Total expected cost synergy estimates increased from $60 million to $75 million, and the rate of capture has also accelerated.
Customer collaboration and feedback has been extremely positive, and cultural integration has been excellent, as evidenced by the employee engagement scores that clearly reflect Avient is a great place to work.
Each of such adjustments has not yet occurred, are out of the Company's control and/or cannot be reasonably predicted.
https://www.avient.com/sites/default/files/2020-09/stat-tech-tri-fold-processing-guide.pdf
Testing the application is highly recommended to determine the effect recycling has on the desired physical properties.
PROBLEM CAUSE SOLUTION Incomplete Fill Melt and/or mold temperature too cold Mold design Shot Size • Increase nozzle and barrel temperatures • Increase mold temperature • Increase injection speed • Increase pack and hold pressure • Increase nozzle tip diameter • Check thermocouples and heater bands • Enlarge or widen vents and increase number of vents • Check that vents are unplugged • Check that gates are unplugged • Enlarge gates and/or runners • Perform short shots to determine fill pattern and verify proper vent location • Increase wall thickness to move gas trap to parting line • Increase shot size • Increase cushion Brittleness Melt temperature too low Degraded/Overheated material Gate location and/or size • Increase melt temperature • Increase injection speed • Measure melt temperature with pyrometer • Decrease melt temperature • Decrease back pressure • Use smaller barrel/excessive residence time • Relocate gate to nonstress area • Increase gate size to allow higher flow speed and lower molded-in stress Fibers on Surface (Splay) Melt temperature too low Insufficient packing • Increase melt temperature • Increase mold temperature • Increase injection speed • Increase pack and hold pressure, and time • Increase shot size • Increase gate size Sink Marks Part geometry too thick Melt temperature too hot Insufficient material volume • Reduce wall thickness • Reduce rib thickness • Decrease nozzle and barrel temperatures • Decrease mold temperature • Increase shot size • Increase injection rate • Increase packing pressure • Increase gate size Flash Injection pressure too high Excess material volume Melt and/or mold temperature too hot • Decrease injection pressure • Increase clamp pressure • Decrease injection speed • Increase transfer position • Decrease pack pressure • Decrease shot size • Decrease injection speed • Decrease nozzle and barrel temperatures • Decrease mold temperature • Decrease screw speed TROUBLESHOOTING RECOMMENDATIONS PROBLEM CAUSE SOLUTION Excessive Shrink Too much orientation • Increase packing time and pressure • Increase hold pressure • Decrease melt temperature • Decrease mold temperature • Decrease injection speed • Decrease screw rpm • Increase venting • Increase cooling time Not Enough Shrink Too little orientation • Decrease packing pressure and time • Decrease hold pressure • Increase melt temperature • Increase mold temperature • Increase injection speed • Increase screw rpm • Decrease cooling time Burning Melt and/or mold temperature too hot Mold design Moisture • Decrease nozzle and barrel temperatures • Decrease mold temperature • Decrease injection speed • Clean, widen and increase number of vents • Increase gate size or number of gates • Verify material is dried at proper conditions Nozzle Drool Nozzle temperature too hot • Decrease nozzle temperature • Decrease back pressure • Increase screw decompression • Verify material has been dried at proper conditions Weld Lines Melt front temperatures too low Mold design • Increase pack and hold pressure • Increase melt temperature • Increase vent width and locations • Increase injection speed • Increase mold temperature • Decrease injection speed • Increase gate size • Perform short shots to determine fill pattern and verify proper vent location • Add vents and/or false ejector pin • Move gate location Warp Excessive orientation Mold design • Increase cooling time • Increase melt temperature • Decrease injection pressure and injection speed • Increase number of gates Sticking in Mold Cavities are overpacked Mold design Part is too hot • Decrease injection speed and pressure • Decrease pack and hold pressure • Decrease nozzle and barrel temperatures • Decrease mold temperature • Increase cooling time • Increase draft angle • Decrease nozzle and barrel temperatures • Decrease mold temperature • Increase cooling time TROUBLESHOOTING RECOMMENDATIONS www.avient.com Copyright © 2020, Avient Corporation.
https://www.avient.com/sites/default/files/2020-12/therma-tech-processing-guide.pdf
Testing the application is highly recommended to determine the effect recycling has on the desired physical properties.
Maintain a minimum draft angle of 1° per side. 4 Therma-Tech Troubleshooting Recommendations Problem Cause Solution Incomplete Fill Melt and/or mold too cold • Increase nozzle and barrel temperatures • Increase mold temperature • Increase injection rate • Increase pack and hold pressure • Increase nozzle tip diameter • Check thermocouples and heater bands Mold design • Enlarge or widen vents and increase number of vents • Check that vents are unplugged • Check that gates are unplugged • Enlarge gates and/or runners • Perform short shots to determine fill pattern and verify proper vent location • Increase wall thickness to move gas trap to parting line Shot size • Increase shot size • Increase cushion • Decrease transfer position Brittleness Low melt temperature • Increase melt temperature • Increase injection rate • Measure melt temperature with pyrometer Degraded/ overheated material • Decrease melt temperature • Decrease back pressure • Use smaller barrel/excessive residence time • Decrease screw rpm Gate location and/or size • Relocate gate to nonstress area • Increase gate size to allow higher flow rate and lower molded in stress Fibers on Surface (Splay) Melt temperature too low • Increase melt temperature • Increase mold temperature • Increase injection speed • Increase screw rpm Insufficient packing • Increase pack and hold pressure, and time • Increase shot size • Increase gate size Processing Guide 5 Problem Cause Solution Sink Marks Part geometry too thick • Reduce wall thickness • Reduce rib thickness • Maintain nominal wall thickness Melt too hot • Decrease nozzle and barrel temperatures • Decrease mold temperature Insufficient material volume • Increase shot size • Increase injection rate • Increase pack pressure/time • Increase gate size Flash Injection pressure too high • Decrease injection pressure • Increase clamp pressure • Decrease injection rate • Increase transfer position Excess material volume • Decrease pack pressure • Decrease shot size • Decrease injection rate Melt and/or mold too hot • Decrease nozzle and barrel temperatures • Decrease mold temperature • Decrease screw speed Excessive Shrink Too much orientation • Increase packing time and pressure • Increase hold pressure • Decrease melt temperature • Decrease mold temperature • Decrease injection speed • Decrease screw rpm • Increase venting • Increase cooling time Not Enough Shrink Too little orientation • Decrease packing pressure and time • Decrease hold pressure • Increase melt temperature • Increase mold temperature • Increase injection speed • Increase screw rpm • Decrease cooling time Troubleshooting Recommendations 6 Therma-Tech Troubleshooting Recommendations Problem Cause Solution Burning Melt and/or mold too cold • Decrease nozzle and barrel temperatures • Decrease mold temperature • Decrease injection rate Mold design • Clean, widen and increase number of vents • Increase gate size or number of gates Moisture • Verify material is dried at proper conditions Nozzle Drool Nozzle temperature too hot • Decrease nozzle temperature • Decrease back pressure • Increase screw decompression • Verify material has been dried at proper conditions Weld Lines Melt front temperatures are too low • Increase pack and hold pressure • Increase melt temperature • Increase vent width and locations • Increase injection rate • Increase mold temperature Mold design • Decrease injection rate • Increase gate size • Perform short shots to determine fill pattern and verify proper vent location • Add vents and/or false ejector pin • Move gate location Warp Excessive orientation • Increase cooling time • Increase melt temperature • Decrease injection pressure and injection rate Mold design • Increase number of gates Sticking in Mold Cavities are overpacked • Decrease injection rate and pressure • Decrease pack and hold pressure • Decrease nozzle and barrel temperatures • Decrease mold temperature • Increase cooling time Mold design • Increase draft angle Part is too hot • Decrease nozzle and barrel temperatures • Decrease mold temperature • Increase cooling time 1.844.4AVIENT www.avient.com Copyright © 2020, Avient Corporation.