https://www.avient.com/sites/default/files/2023-08/Fiber-Line Winding Product Bulletin.pdf
Headquarters, R&D, Manufacturing Fiber-Line LLC 3050 Campus Drive Hatfield, PA 19440 +1 215.997.9181 Manufacturing Operations Fiber-Line LLC 280 Performance Drive SE Hickory, NC 28602 +1 828.326.8700 European Headquarters, Operations, Sales Office Fiber-Line International B.V.
https://www.avient.com/sites/default/files/2024-11/Edwards Ballistic Panel Case Study.pdf
Guided by their initiative to develop capabilities that provide additional protection for soldiers while reducing time and logistic requirements,1 the U.S.
With our hardware fabrication capabilities and Avient’s knowledge of composite ballistic protection technology, we were able to create modular systems that reduce time and logistic requirements for our brave soldiers.” 1 https://www.erdc.usace.army.mil/Missions/Military-Engineering/Deployable-Force-Protection-Demo/ To learn more about ballistic resistant solutions from Avient, visit avient.com or click to request a quote.
https://www.avient.com/sites/default/files/2023-01/GlasArmor Ballistic Resistant Panels Case Study.pdf
TOUGH ENOUGH TO PROTECT THE POWER GRID MODULAR BALLISTIC PROTECTION MADE POSSIBLE WITH COMPOSITES THE CHALLENGE Recent attacks on U.S. electrical substations across the country provide stark reminders that our nation’s power supply remains a primary target for criminals focused on harming our country and security.1 The call to action is evident: we must continually improve the physical and technological infrastructure protection of our nation’s energy supply.
Using GlasArmor panels, Ballisti-Wall® and Ballisti- Cover® solutions enable utility companies to add a superior level of protection to critical components and meet FERC security requirements within a modular, adaptable construction. 1 https://www.nbcnews.com/news/us-news/three-substations- attacked-washington-state-rcna63214 2 https://www.ferc.gov/sites/default/files/2020-04/E-4_10.pdf © 2023, All Rights Reserved Avient Corporation, 33587 Walker Road, Avon Lake, Ohio USA 44012 To learn more about Avient’s advanced composite solutions, visit www.avient.com/composites. https://www.nbcnews.com/news/us-news/three-substations-attacked-washington-state-rcna63214 https://www.nbcnews.com/news/us-news/three-substations-attacked-washington-state-rcna63214 https://www.ferc.gov/sites/default/files/2020-04/E-4_10.pdf http://www.avient.com/composites
https://www.avient.com/sites/default/files/2021-03/wet-grip-tpe-surfco-case-study.pdf
WET GRIP TECHNOLOGY PROVIDES POWERFUL SOLUTION FOR SURFCO HAWAII © 2021, All Rights Reserved Avient Corporation, 33587 Walker Road, Avon Lake, Ohio USA 44012 1 Wax Mat® is a trademark of SurfCo Hawaii, Inc.
THE IMPACT The launch of the Wax Mat®1 grip tape introduced a fresh alternative to wax for wet grip to surfboard decks, helping to further differentiate SurfCo.
https://www.avient.com/sites/default/files/2021-06/afip-administracion-federal-de-ingresos-publicos.pdf
29/6/2021 Formulario de Impresión de Constancia de Inscripción https://seti.afip.gob.ar/padron-puc-constancia-internet/ConsultaConstanciaAction.do 1/1 ADMINISTRACION FEDERAL DE INGRESOS PUBLICOS CONSTANCIA DE INSCRIPCION AVIENT ARGENTINA S.A.
https://www.avient.com/sites/default/files/2021-08/2030-goals-2020-sustainability-report.pdf
By 2030, Avient will reduce Scope 1 & 2 greenhouse gas (GHG) emissions by 60% with 2019 as a baseline and achieve operational carbon neutrality by 2050.
Update: • We are proud to have reached our original target of 35% in 2020 by reducing our Scope 1 & 2 GHG emissions by 37%. • Our next level commitment for 2030 has been established, whereby we will achieve a reduction of 60% and operational carbon neutrality by 2050.
https://www.avient.com/sites/default/files/2021-01/amendment-to-articles-commercial-registration-avient-corporation.pdf
The resolution was adopted pursuant to Ohio Revised Code section 1701.70(B) (In this space insert the number 1 through 10 to provide basis for adoption.)
Upon review of the amendment document presented, my findings are as follows: 1.
The fees are as follows: Expedite 1 $100 2 Business Days Expedite 2 $200 1 Business Day Expedite 3 $300 4 Business Hours 2.
https://www.avient.com/sites/default/files/2024-09/Avient_RY 2023 CDP Verification Opinion Declaration.pdf
Boundaries of the reporting company GHG emissions covered by the verification: • Operational Control • Global Exclusions: • Fugitive refrigerants from units
Energy: o Diesel Fuel Consumption: 2,868,323 kWh o Natural Gas Fuel Consumption: 178,696,287 kWh o Renewable Energy Consumed - Self Generated (solar): 681,059 kWh o Renewable Energy Consumed - Self Generated (Wind): 2,385,048 kWh o Grid Electricity Consumed: 409,650,679 kWh o Renewable Energy Credits (REC) Purchased: 112,413,420 kWh o Renewable Electricity Consumed – Offsite: 138,415,253 kWh Page 2 Period covered by GHG emissions verification: • January 1, 2023 to December 31, 2023 Global Warming Potential (GWP) and emission factor data sets: • IPCC GWP: AR6 • USEPA Emission Factor Hub, released 2024 • USEPA eGRID, released 2024 • Final Rule (40 CFR 98) - Industrial Sector 2013 • DEFRA, released 2023 • IEA, released 2023 • European Residual Mix, released 2022 v2.0 GHG Reporting Protocols against which verification was conducted: • World Resources Institute (WRI)/World Business Council for Sustainable Development (WBCSD) Greenhouse Gas Protocol, Corporate Accounting and Reporting Standard, Revised Edition (Scope 1 and 2) and the GHG Protocol Scope 2 Guidance, an amendment to the GHG Protocol Corporate Standard • WRI/WBCSD Corporate Value Chain (Scope 3) Accounting and Reporting Standard Verification Protocols used to conduct the verification: • ISO 14064-3 Second Edition 2019-04: Greenhouse gases - Part 3: Specification with guidance for the verification and validation of greenhouse gas statements • Apex’s standard procedures and guidelines for external Assurance of Sustainability Reports and International Standard on Assurance Engagements (ISAE) 3000 Revised, Assurance Engagements Other than Audits or Reviews of Historical Financial Information (effective for assurance reports dated on or after Dec. 15, 2015), issued by the International Auditing and Assurance Standards Board.
Page 3 Verification Opinion: Based on the verification process and procedures conducted to a limited assurance level of the GHG emissions statement shown above, Apex found no evidence that the GHG emissions statement: • is not materially correct and is not a fair representation of the GHG emissions data and information; and • has not been prepared in accordance with the WRI/WBCSD GHG Protocol Corporate Accounting and Reporting Standard (Scope 1 and 2), and WRI/WBCSD Greenhouse Gas Protocol Corporate Value Chain Accounting and Reporting Standard (Scope 3).
https://www.avient.com/sites/default/files/2023-01/Avient Audit Committee Charter.pdf
Oversight of the Company’s Relationship with the Independent Auditor 1.
Oversight of the Company’s Internal Audit Function 1.
Compliance Oversight Responsibilities 1.
https://www.avient.com/sites/default/files/resources/Terms%2520and%2520Conditions%2520of%2520Sale%2520for%2520Hungary.pdf
PolyOne - Bilingual T&Cs - Hungary - 1 - PAI-376902v1 TERMS AND CONDITIONS OF SALE The Terms and Conditions herein apply to the sale of PolyOne products 1.
All late payments shall bear an annual interest of one month (1) EURIBOR plus 8% accrued on a daily basis, notwithstanding any damages.
Minden késedelmes fizetés az EURIBOR egy (1) hónapra vetített éves kamatának plusz 8 százaléknak a felszámítását vonja maga után napi elszámolással, a károk nélkül.