https://www.avient.com/sites/default/files/2024-02/US_OH_North Baltimore_ ISO_IEC 17025.pdf
No. 0562.01) Revised 05/31/2022 Page 1 of 1 SCOPE OF ACCREDITATION TO ISO/IEC 17025:2017 AVIENT CORPORATION 733 East Water Street North Baltimore, OH 45872 Claire Holman Phone: (419) 257-1327 MECHANICAL Valid To: October 31, 2023 Certificate Number: 0562.01 In recognition of the successful completion of the A2LA evaluation process, accreditation is granted to this laboratory to perform the following automotive plastics tests: Test Method: Test Name: ASTM D412 Tensile ASTM D523 Specular Gloss ASTM D618 (A) Conditioning of Plastics ASTM D624 (Die C) Tear Strength ASTM D638 Tensile Properties ASTM D792 (A) Density and Specific Gravity by Displacement ASTM D1004 Initial Tear Resistance ASTM D1203 (A) Volatile Loss ASTM D1895 (A) Apparent Density, Bulk Factor, Pourability ASTM D1921 Particle Size (Sieve Analysis) ASTM D2240 Durometer Hardness (Shore A and D) ASTM E1331 Color by Spectrophotometry Using Hemispherical Geometry FMVSS 571.302 Flammability FORD BN-102-01 (A) Low Temperature Flexibility FORD BO-131-03 Interior Odor ISO 3795 Determination of Burning Behavior of Interior Materials SAE J323 (A) Cold Cracking (Mandrel Bend) SAE J1351 Hot Odor for Insulation Materials SAE J1545 Instrumental Color Difference Measurement SAE J1756 Fogging Characteristics of Interior Automotive Materials (Photometric Only) DOC-058151 Angle of Repose 1 Laboratory Developed Method For the tests to which this accreditation applies, please refer to the laboratory’s Mechanical Scope of Accreditation.
https://www.avient.com/sites/default/files/2024-09/Avient_RY 2023 CDP Verification Opinion Declaration.pdf
Boundaries of the reporting company GHG emissions covered by the verification: • Operational Control • Global Exclusions: • Fugitive refrigerants from units
Energy: o Diesel Fuel Consumption: 2,868,323 kWh o Natural Gas Fuel Consumption: 178,696,287 kWh o Renewable Energy Consumed - Self Generated (solar): 681,059 kWh o Renewable Energy Consumed - Self Generated (Wind): 2,385,048 kWh o Grid Electricity Consumed: 409,650,679 kWh o Renewable Energy Credits (REC) Purchased: 112,413,420 kWh o Renewable Electricity Consumed – Offsite: 138,415,253 kWh Page 2 Period covered by GHG emissions verification: • January 1, 2023 to December 31, 2023 Global Warming Potential (GWP) and emission factor data sets: • IPCC GWP: AR6 • USEPA Emission Factor Hub, released 2024 • USEPA eGRID, released 2024 • Final Rule (40 CFR 98) - Industrial Sector 2013 • DEFRA, released 2023 • IEA, released 2023 • European Residual Mix, released 2022 v2.0 GHG Reporting Protocols against which verification was conducted: • World Resources Institute (WRI)/World Business Council for Sustainable Development (WBCSD) Greenhouse Gas Protocol, Corporate Accounting and Reporting Standard, Revised Edition (Scope 1 and 2) and the GHG Protocol Scope 2 Guidance, an amendment to the GHG Protocol Corporate Standard • WRI/WBCSD Corporate Value Chain (Scope 3) Accounting and Reporting Standard Verification Protocols used to conduct the verification: • ISO 14064-3 Second Edition 2019-04: Greenhouse gases - Part 3: Specification with guidance for the verification and validation of greenhouse gas statements • Apex’s standard procedures and guidelines for external Assurance of Sustainability Reports and International Standard on Assurance Engagements (ISAE) 3000 Revised, Assurance Engagements Other than Audits or Reviews of Historical Financial Information (effective for assurance reports dated on or after Dec. 15, 2015), issued by the International Auditing and Assurance Standards Board.
Page 3 Verification Opinion: Based on the verification process and procedures conducted to a limited assurance level of the GHG emissions statement shown above, Apex found no evidence that the GHG emissions statement: • is not materially correct and is not a fair representation of the GHG emissions data and information; and • has not been prepared in accordance with the WRI/WBCSD GHG Protocol Corporate Accounting and Reporting Standard (Scope 1 and 2), and WRI/WBCSD Greenhouse Gas Protocol Corporate Value Chain Accounting and Reporting Standard (Scope 3).
https://www.avient.com/sites/default/files/2021-01/amendment-to-articles-commercial-registration-avient-corporation.pdf
The resolution was adopted pursuant to Ohio Revised Code section 1701.70(B) (In this space insert the number 1 through 10 to provide basis for adoption.)
Upon review of the amendment document presented, my findings are as follows: 1.
The fees are as follows: Expedite 1 $100 2 Business Days Expedite 2 $200 1 Business Day Expedite 3 $300 4 Business Hours 2.
https://www.avient.com/sites/default/files/2023-09/Avient Sustainability Day 2023 - Website %289.19%29.pdf
Pro Forma Financial Information The Company acquired Avient Protective Materials (“Dyneema”) on September 1, 2022 (the “Acquisition Date”) and sold the Distribution segment on November 1, 2022.
To provide comparable results, the company references “pro forma” financial metrics, which include the business results of Avient Protective Materials for periods prior to the Acquisition Date, as if the transaction occurred on January 1, 2021 and reflect Distribution as a discontinued operation.
The Company acquired the Clariant Color business on July 1, 2020.
https://www.avient.com/sites/default/files/2023-01/Avient Audit Committee Charter.pdf
Oversight of the Company’s Relationship with the Independent Auditor 1.
Oversight of the Company’s Internal Audit Function 1.
Compliance Oversight Responsibilities 1.
https://www.avient.com/sites/default/files/2023-08/Fiber-Line Winding Product Bulletin.pdf
Headquarters, R&D, Manufacturing Fiber-Line LLC 3050 Campus Drive Hatfield, PA 19440 +1 215.997.9181 Manufacturing Operations Fiber-Line LLC 280 Performance Drive SE Hickory, NC 28602 +1 828.326.8700 European Headquarters, Operations, Sales Office Fiber-Line International B.V.
https://www.avient.com/sites/default/files/2021-06/afip-administracion-federal-de-ingresos-publicos.pdf
29/6/2021 Formulario de Impresión de Constancia de Inscripción https://seti.afip.gob.ar/padron-puc-constancia-internet/ConsultaConstanciaAction.do 1/1 ADMINISTRACION FEDERAL DE INGRESOS PUBLICOS CONSTANCIA DE INSCRIPCION AVIENT ARGENTINA S.A.
https://www.avient.com/sites/default/files/2021-08/2030-goals-2020-sustainability-report.pdf
By 2030, Avient will reduce Scope 1 & 2 greenhouse gas (GHG) emissions by 60% with 2019 as a baseline and achieve operational carbon neutrality by 2050.
Update: • We are proud to have reached our original target of 35% in 2020 by reducing our Scope 1 & 2 GHG emissions by 37%. • Our next level commitment for 2030 has been established, whereby we will achieve a reduction of 60% and operational carbon neutrality by 2050.
https://www.avient.com/sites/default/files/2024-03/Edgetek PKE High Impact Formulations Technical Bulletin.pdf
TECHNICAL PROPERTIES(1) TEST METHOD Edgetek™ ET8900-0011 HI UV NAT Edgetek™ ET8900-0012 HI UV White Edgetek™ ET8900-0013 HI UV Black Physical Density/Specific Gravity ASTM D792 1.13 g/cm3 1.15 g/cm3 1.13 g/cm3 Molding Shrinkage - Flow ASTM D955 1.4–2% 1.4–2% 1.4–2% Mechanical Tensile Strength (Yield) ASTM D638 5,900 psi 5,800 psi 5,800 psi Tensile Modulus(2) ASTM D638 169,000 psi 161,087 psi 176,000 psi Flexural Modulus(3) ASTM D790 187,000 psi 190,985 psi 188,000 psi Impact Notched Izod Impact 73°F (23°C), 0.125 in ASTM D256A 17.3 ft-lb/in 16.5 ft-lb/in 16.5 ft-lb/in Notched Izod Impact -22°F (-30°C), 0.125 in ASTM D256A 3.2 ft-lb/in 3.0 ft-lb/in 3.3 ft-lb/in Thermal (HDT) 66 psi (0.45 MPa), 0.125 in ASTM D648 121°C 135°C 129°C NORTH AMERICA GRADES (1) Data based on single lot of lab generated samples.
https://www.avient.com/sites/default/files/2023-01/GlasArmor Ballistic Resistant Panels Case Study.pdf
TOUGH ENOUGH TO PROTECT THE POWER GRID MODULAR BALLISTIC PROTECTION MADE POSSIBLE WITH COMPOSITES THE CHALLENGE Recent attacks on U.S. electrical substations across the country provide stark reminders that our nation’s power supply remains a primary target for criminals focused on harming our country and security.1 The call to action is evident: we must continually improve the physical and technological infrastructure protection of our nation’s energy supply.
Using GlasArmor panels, Ballisti-Wall® and Ballisti- Cover® solutions enable utility companies to add a superior level of protection to critical components and meet FERC security requirements within a modular, adaptable construction. 1 https://www.nbcnews.com/news/us-news/three-substations- attacked-washington-state-rcna63214 2 https://www.ferc.gov/sites/default/files/2020-04/E-4_10.pdf © 2023, All Rights Reserved Avient Corporation, 33587 Walker Road, Avon Lake, Ohio USA 44012 To learn more about Avient’s advanced composite solutions, visit www.avient.com/composites. https://www.nbcnews.com/news/us-news/three-substations-attacked-washington-state-rcna63214 https://www.nbcnews.com/news/us-news/three-substations-attacked-washington-state-rcna63214 https://www.ferc.gov/sites/default/files/2020-04/E-4_10.pdf http://www.avient.com/composites