https://www.avient.com/sites/default/files/2020-08/eccoh-cpr-product-bulletin.pdf
Additional Criteria
• Total heat release (MJ/m²)
• pHRR (kW/m²)
• Time of Ignition (s)
• Smoke production
• Acidity
• Flaming droplets
This example demonstrates the
need to consider the complete
cable design, as using XLPE for the
insulation layer would not give the
required Euroclass.
https://www.avient.com/sites/default/files/2023-04/Fiber Colorants and Additives Brochure.pdf
Our technical laboratories and production processes
are completely integrated and equipped with
state-of-the-art technology focused on minimizing
waste products.
https://www.avient.com/sites/default/files/2022-05/ColorMatrix Amosorb Solo Technical Bulletin.pdf
The coarse ground material was then
crystallized in a vacuum oven at 160°C before
drying the material at 160°C for approx. 4 hours
within a PET drier
• Plaques were then molded on a BOY XS and 10
of these were kept after each cycle, to take color
measurements
• This process was then repeated until 5 heat
cycles had been completed
RESULTS FOR RECYCLABILITY METHOD-1
As plaques were produced while the material went
through five different melt heat histories, plaques
were produced at each cycle and L*, a*, and b*
values were measured.
https://www.avient.com/sites/default/files/2023-10/31307-Certificate-20SEP2023.pdf
ECert - 2023-09-20T092923.129.pdf
Page 1 of 7
Validity of this certificate is based on the successful completion of the periodic surveillance audits of the management system defined by the above scope and is contingent upon
prompt,written notification to ABS Quality Evaluations, Inc. of significant changes to the management system or components thereof.
https://www.avient.com/sites/default/files/2022-07/Avient 2021 Sustainability Report 7-26-22.pdf
In 2021, 161 leaders completed the experience.
In 2021, we successfully completed the
pre-registration for UK REACH post Brexit.
In 2021, we successfully
completed the pre-registration for UK REACH post Brexit.
https://www.avient.com/sites/default/files/resources/PolyOne%25202017%2520Proxy%2520Statement.PDF
Please complete, sign, date and
return your proxy or voting instruction forff m, or submit your vote and
proxy by telephone or over the Internet.
She was Executive Vice
President, then Corporate Executive VicePresident,atCelanese
Corporation, a global hybrid chemical company, from 2007 to
2010.
In the event of a
change of control, cash-settled performance units for which all perforff mance periods are completed as of December
31, 2016 are valued at actual attainment, and cash-settled performance units for which all perforff mance periods are
not completed as of December 31, 2016 are valued at target attainment.
https://www.avient.com/sites/default/files/2024-08/Avient-2023-Sustainability-Report_6.pdf
In 2023, 127 leaders completed the experience.
To date we have completed over 2,000 product carbon footprint
calculations.
We partnered with EcoVadis and IntegrityNext in order to complete these assessments.
https://www.avient.com/sites/default/files/2024-08/Avient-2023-Sustainability-Report_5.pdf
In 2023, 127 leaders completed the experience.
To date we have completed over 2,000 product carbon footprint
calculations.
We partnered with EcoVadis and IntegrityNext in order to complete these assessments.
https://www.avient.com/sites/default/files/2024-08/Avient 2023 Sustainability Report_6.pdf
In 2023, 127 leaders completed the experience.
To date we have completed over 2,000 product carbon footprint
calculations.
We partnered with EcoVadis and IntegrityNext in order to complete these assessments.
https://www.avient.com/sites/default/files/resources/PolyOne%25202013%2520Annual%2520Report.pdf
We completed our testing of impairment as of October 1, noting no impairment in 2013,
2012 or 2011.
These actions are expected to be completed by the end of
2014.
Upon completion, projects are reclassified to technology and amortized
over their useful lives.